Today arm/lift work continued for our four bar linkage as well as work on the accumulator roller and driver practice continued as well. Arm/lift is now powered by two motors and a 7:1 gear reduction (84:12) which was the determined target ratio based on earlier lift testing with our Gateway robot. The accumulator roller prototype is now mounted to a temporary frame for initial testing purposes. In all, one of those solid workmanlike meetings thatwill certainly pay off in the long run.
No comments:
Post a Comment